History and Reform of Power Sector in Tripura 

 

The Power Supply industry in Tripura was under the control of the Department of Power, Government of Tripura till 31st December 2004. The Department of Power, Government of Tripura was entrusted with Generation, Transmission, and Distribution including Rural Electrification since inception. The Department of Power had remained a beneficiary constituent of North Eastern Regional Electricity Board. Tripura State Electricity Corporation Limited had started functioning w.e.f 1st January 2005. Subsequently TSECL has taken over the entire existing network along with asset of erstwhile Department of Power for operating and maintaining the power supply industry in the State of Tripura. The State has a Population of 31.91 Lakhs as per 2001 census and spread over 10,486 sq. km. in 4 districts comprising of 4 major towns and 870 villages. The state is predominantly agrarian with few small scale industries. 

In line with the provision of the MOU between Ministry of Power, Govt. of India and Government of Tripura, the State Government decided to introduce reforms in the power sector in the state and restructure the sector with objectives of creating the conditions for the sustainable development of the power sector in the state and improving the efficiency of services to the people of Tripura. So, in 2002, the Government of Tripura entrusted the Administrative Staff College of India (ASCI), Hyderabad to provide consultancy services to assess restructuring options and recommend suitable organisation structure for the power sector. The assignment also included inter-alia the financial restructuring plan and formulation of implementation programme.

As per the ASCI recommendations, Tripura Electricity Regulatory Commission (TERC) was set up on 31st May 2004 and subsequently, Tripura State Electricity Corporation Limited (TSECL), Agartala was incorporated under the Indian Companies Act-56 on 9th June 2004 as a State owned Company with authorised equity share capital of Rs.10 crores. It has been made functional under, section 131 & 133 of the IE Act 2003, w.e.f 1st January 2005 with the operational control of all assets related to Generation, Transmission, Distribution & its allied activities related to power sector of Tripura and with objective of creating conditions for the sustainable development of the power sector along with improvement in efficiency of services to the consumer in particular and the State at large.  

 

 

 

 Existing Power System

 

 Generation

 

Name of Project
Installed Capacity
Effective Capacity
Gumti H.E Project

5x3=15.00 MW

8.5 MW

Baramura Gas Thermal Project

21x1=21.00 MW

21.00 MW

Rokhia Gas Thermal Project

8x4+21x2=74.00 MW

50.00 MW

Total

110.00 MW

79.50 MW

 

 Transmission and Distribution Network

 

Particulars
Line
Sub-Station
Capacity
132 KV

387.63 CKM

10 Nos.

200.00 MVA

66 KV

380.20 CKM

13 Nos.

165.50 MVA

33 KV

504.52 CKM

35 Nos.

217.95 MVA

11 KV

7687.18 CKM

5915 Nos.

484.81 MVA

LT

13849.05 CKM

   
HT:LT Ratio
 
1 : 1.80
 

 

 Interconnection

 

The state power systems in the North Eastern Region are integrated with 400/220 kV network of Power Grid Corporation of India Ltd.  The power system of Tripura is connected to these power systems of the neighbouring states in the North Eastern region at 132 kV.  This provides the stable operation for the state power system.
 

 Consumer Profile

 

 

 
Category No. of Consumer % of Total
DOMESTIC 348551 88.26%
COMMERCIAL 36760 9.31%
INDUSTRIAL 3780 0.96%
BULK SUPPLY 376 0.10%
IRRIGATION & WATER WORKS 4692 1.19%
OTHERS 739 0.19%

 

 

 Commercial Overview

 

¨      Total Consumers – 394898 No

¨      % coverage of Households – 59.44%

¨      100% Metering up to 11 KV Level

¨      100% Computerized Energy Billing to be Achieved by  2009

¨      Average Cost of Supply – Rs. 2.74 /kWh

¨      Average Rate of Realization – Rs. 2.58 /kWh

¨      Annual Per Capita Consumption – 192.48 kWh

 

Development Of Generation Sector In Tripura

Maximum Demand

Energy Generation From State Owned Generating Station

Consumer Stasictics In Tripura

 

Disclaimer: Though all efforts are made to publish accurate information, web masters do not take any responsibility for any inadvertent error. All those concerned are advised to cross check with the official data published from concerned offices of the TSECL to ensure the correctness of the information provided herein.