Despite increase in number of
consumers, peak demand has shown a declining trend over the period.
With change in tariff structure from ‘contracted load basis’ to ‘consumption
basis’, there is growing
consciousness amongst the consumers for energy efficient practices/devices
such as CFLs. Intensive
vigilance efforts to detect line theft and increased efforts by TSECL for
system improvement has also
contributed to this decline. The existing level of peak demand is expected
to continue with increasing
efforts of TSECL for improving system efficiencies and detecting life theft.
|
|
2004-05
|
2005-06
|
2006-07
|
2007-08
|
2008-09
|
2009-10
|
|
Peak
Load
|
160 MW
|
164 MW
|
177 MW
|
192 MW
|
209 MW
|
228 MW
|
|
Own
Generation (effective)
|
68 MW
|
68 MW
|
74 MW
|
79.5
MW
|
79.5
MW
|
79.5
MW
|
|
Central Sector (Share)
|
132 MW
|
123 MW
|
124 MW
|
99 MW
|
99 MW
|
99 MW
|
|
Central Sector (Effective Drawal)
|
45 MW
|
45 MW
|
45 MW
|
45 MW
|
45 MW
|
45 MW
|
|
Short-fall/Surplus (Peak)
|
-47 MW
|
-51 MW
|
-58 MW
|
-67.5
MW
|
-84.5
MW
|
-103.5
MW
|
|
|
2010-11
|
2011-12
|
2012-13
|
2013-14
|
2014-15
|
2015-16
|
|
Peak Load
|
250 MW
|
282 MW
|
309 MW
|
331 MW
|
355 MW
|
374 MW
|
|
Own Generation (effective)
|
79.5 MW
|
79.5 MW
|
172 MW
|
172 MW
|
172 MW
|
172 MW
|
|
Central Sector (Share)
|
99 MW
|
149 MW
|
149 MW
|
149 MW
|
149 MW
|
149 MW
|
|
Central Sector (Effective
Drawal)
|
45 MW
|
45 MW
|
50 MW
|
50 MW
|
50 MW
|
50 MW
|
|
Palatana & Monarchak Share
|
100 MW
|
200 MW
|
200 MW
|
200 MW
|
200 MW
|
200 MW
|
|
Short-fall/Surplus (Peak)
|
-25.5 MW
|
42.5 MW
|
113 MW
|
91 MW
|
67 MW
|
48 MW
|
|
|
2016-17
|
2017-18
|
2018-19
|
2019-20
|
2020-21
|
2021-22
|
|
Peak Load
|
367 MW
|
396 MW
|
405 MW
|
414 MW
|
423 MW
|
431 MW
|
|
Own Generation (effective)
|
172 MW
|
130 MW
|
130 MW
|
126 MW
|
126 MW
|
105 MW
|
|
Central Sector (Share)
|
149 MW
|
149 MW
|
149 MW
|
149 MW
|
149 MW
|
149 MW
|
|
Central Sector (Effective
Drawal)
|
50 MW
|
50 MW
|
50 MW
|
50 MW
|
50 MW
|
50 MW
|
|
Palatana & Monarchak Share
|
200 MW
|
200 MW
|
200 MW
|
200 MW
|
200 MW
|
200 MW
|
|
Short-fall/Surplus (Peak)
|
55 MW
|
-16 MW
|
-25 MW
|
-38 MW
|
-47 MW
|
-76 MW
|
Central Sector (NER) Share of
Tripura from NEEPCO & NHPC
ABC of ABT a primer on
availability tariff
Real
Time Power System Information
|
|
Disclaimer: Though all efforts are made to publish accurate information, web
masters do not take any responsibility for any inadvertent error. All those concerned
are advised to cross check with the official data published from concerned
offices of the TSECL to ensure the correctness of the information provided
herein.
© Tripura State Electricity Corporation Limited. The site is Designed &